Water Transmission Design Critera Revise For Central & Eastern Guilan Townships |
Introduction: |
Feasibility study & environmental justification for execution of wastewater project. |
Client: |
Guilan Regional Water Authority |
Contractor(s): |
|
Population served: |
2,300,000 (Final Stage) |
Total Water Demand: |
650,000 m³/day |
Major Water Sources: |
Mainly Sephidroud River (85%) |
Location Of Treatment Plants: |
Sangar & Rasht- Ghazvin Roud |
Capacity Of Treatment Plants: |
Totally 6,600 Lit/s |
Length Of Transmission Pipelines: |
Approx.450 Km |
Diameter OF Transmission Pipelines: |
400 mm to 1250 mm |
Material Of Transmission Pipes: |
Ductil Iron & Prepacked concrete |
Execution Cost: |
|
|