| Water Transmission Design Critera Revise For Central & Eastern Guilan Townships |
| Introduction: |
Feasibility study & environmental justification for execution of wastewater project. |
| Client: |
Guilan Regional Water Authority |
| Contractor(s): |
|
| Population served: |
2,300,000 (Final Stage) |
| Total Water Demand: |
650,000 m³/day |
| Major Water Sources: |
Mainly Sephidroud River (85%) |
| Location Of Treatment Plants: |
Sangar & Rasht- Ghazvin Roud |
| Capacity Of Treatment Plants: |
Totally 6,600 Lit/s |
| Length Of Transmission Pipelines: |
Approx.450 Km |
| Diameter OF Transmission Pipelines: |
400 mm to 1250 mm |
| Material Of Transmission Pipes: |
Ductil Iron & Prepacked concrete |
| Execution Cost: |
|
|